The customer had two damaged and leaking concrete tanks. The concrete tanks were demolished and two new 22,700 litre poly tanks were installed on a crusher dust pad. New pipework was used to connect the existing pump and rain water to the tanks. Two loads of water delivered and the customer was back in action, all within the same day.